| 17.3.2011 | A feasibility and economic study into the use of micro hydro power applications to generate electricity from the Victoria Capital Regional District’s municipal water facility. Victoria, British Columbia, Canada. |
Eri Andres Boye
|
| 15.3.2011 | HEP together with wind farm WEP : simulation of energy generation and water level in the reservoir |
Karol Strak
|
| 22.3.2011 | Improved design of hydroelectric projects : hydraulic roughness of TBM-bored tunnels. An experimental study. |
Katarzyna Filipek; Anna Kasprzyk
|
| 9.3.2011 | Technical feasibility of the Mołstowa river energy utilization. |
Pawel Nejranowski
|