14.3.2012 | Quantifying water saturation in steel pipes using X-rays | Haraldur Sigurðsson 1975- |
12.2.2014 | Optimization and profitability of hydro power combined with wind power | Egill Skúlason 1973- |
12.2.2014 | Iceland-UK interconnector : strategy for macroeconomic and legal feasibility | Randall Morgan Greene 1988- |
24.2.2014 | Scenario analysis of the Philippine energy market | Fe Amor Parel Gudmundsson 1975- |
27.8.2014 | Financial benefit of implementing environmental management system ISO 14001 in Icelandic companies | Erla Björk Sigurgeirsdóttir 1965- |
9.2.2015 | Implementation of a new energy storage system for a high altitude long endurance aircraft | Stefanie Dagner 1988- |
10.2.2015 | The role of uncertainty for lumped parameter modeling and optimization of low temperature geothermal resources | Sven Scholtysik 1985- |
10.2.2015 | A review of mineral scaling and its mechanisms in Hveragerði geothermal district heating system | Almar Barja 1988- |
18.2.2016 | Direct utilization of geothermal energy for space cooling in Nicaragua | Jón Sigurður Pétursson 1988- |
18.2.2016 | Economic modeling of cost effective hydrogen production from water electrolysis by utilizing Iceland's regulatory power market | Jacobs, Jeffrey David, 1992- |
18.2.2016 | Thermoeconomic analysis of geothermal power cycles for IDDP-1 chloride mitigation | Mereto, Alberto, 1992- |
18.2.2016 | Preliminary technical and economic feasibility study of binary power plant for Chiweta geothermal field, Malawi | Mwagomba, Tufwane, 1981- |
18.2.2016 | Hydroelectric power station : Nigerleq | Lauritsen, Mads Uhrenholt 1989- |
10.3.2016 | Optimal well placement in the Theistareykir geothermal field for the next well in succession | Jefferies, Basil Alxeander Ira, 1990- |
18.4.2016 | Macro-scale multi criteria site assessment for wind resource development in Iceland | Doheny, Michael Stephen, 1990- |
22.8.2016 | Evaluation of energy demand and energy use of an existing single family building, with special emphasis on energy efficiency of heat exchanger in ventilation | Daniel C. Axelsen 1985- |
25.8.2016 | Offshore wind potential in North Carolina and possible configuratons | Smith, Richard Francis , 1990- |
29.8.2016 | Economic and operational feasibility study : conversion to electric bus for Gray Line's airport route | Carpico,Kimberly Ann, 1980- |
12.1.2017 | Thermal front velocity modelling and lumped parameter simulation | Achou, Yapi Donatien, 1976- |
23.3.2017 | Wind power integration in Iceland : impacts on the Icelandic regulating power market | Michel, Felix Rolf 1991- |
19.3.2018 | Techno-economic assessment of using alternative energy technologies at a remote mining operation in the Yukon territory, Canada | Cicierski, Brennan Peter 1992- |
21.6.2018 | Low temperature geothermal resources in abandoned mines of the Canadian Shield : a case study in the Chapais and Chibougamau area, Québec, Canada | Morgan, Andrea Louise Frances, 1992- |
21.6.2018 | An exploration of critical junctures for public participation in multinational final nuclear waste disposal | Rueß, Anja Kathrin, 1993- |
21.6.2018 | Modelling consumer type specific electricity load in Iceland | Czock, Berit Hanna, 1993- |
21.6.2018 | 3D modelling of the Reykir geothermal areas in Mosfellssveit, Iceland | Daníel Einarsson 1988- |