21.3.2011 | Environomic optimal design of geothermal conversion systems using life cycle assessment | Matuszewska, Dominika |
14.12.2010 | Exploration of Geothermal Systems with Petrel Modeling Software | Bartucz, Dorottya |
17.3.2011 | A feasibility and economic study into the use of micro hydro power applications to generate electricity from the Victoria Capital Regional District’s municipal water facility. Victoria, British Columbia, Canada. | Boye, Eri Andres |
20.12.2010 | Feasibility study of binary geothermal power plants in Eastern Slovakia : analysis of ORC and Kalina power plants | Kopunicova, Martina |
21.12.2010 | Feasibility study of CHiP plants in the European Union using pure plant oils | Krzyzaniak, Michal |
21.3.2011 | Feasibility study of geothermal utilization of remoteness areas : design and optimization of a small standard power plant | Gonzalez, Emma Baz |
10.3.2011 | A feasibility study of using Biomethane as an alternative fuel for taxis in the Reykjavík capital area | Hannes Arnórsson |
16.12.2010 | Formation of lanthanum zirconates in solid oxide electrolysis cells : experimental studies | da Costa Almeida, Pedro Miguel |
6.1.2011 | Fungi tar degradation : possible application for micro-scale slow pyrolysis rotary kiln | Bozic, Petra |
15.3.2011 | HEP together with wind farm WEP : simulation of energy generation and water level in the reservoir | Strak, Karol |
21.3.2011 | Hólmsá HEP : recommendations for installed capacity based on simulation of energy generation and reservoir level | Ólafur Jónsson |
14.3.2011 | Hydraulic hammer drilling technology to replace air hammer drilling in deep BHE design | Thomson, Michael J. |
10.3.2011 | Hydraulic transient model developed and tested for Karahnjukar Hydroelectric Project with possible applications in Poland | Narożniak, Adam |
8.12.2010 | Hydrogen Fuel Cell Emergency Power System: Installation and Performance of Plug Power GenCore 5B48 Unit | Birek, Lech; Molitorys, Stanisław |
6.1.2011 | Implementation problems with European Union’s energy system regulations in Central East Europe | Krawczyk, Jan |
22.3.2011 | Improved design of hydroelectric projects : hydraulic roughness of TBM-bored tunnels. An experimental study. | Filipek, Katarzyna; Kasprzyk, Anna |
11.3.2011 | Internal reforming and mass transport properties of a reaction sintered Ni-YSZ and a novel porous metal support for SOFC applications | McNeeley, Michael Graham |
14.3.2011 | Investigation of fuel cell technology for long-haul trucks | Misiopecki, Cezary |
15.3.2011 | Investigation of the potential for improving the efficiency of turbines of hydroelectric power generation stations of Alpiq | Loza, Dariusz M. |
22.3.2011 | A lumped parameter modelling method for high-temerature geothermal reservoirs | Björn Sveinbjörnsson |
18.3.2011 | Modeling and integration of a closed loop system for production of SNG from microalgae | Chrusciak, Monika |
18.3.2011 | Modeling and thermoeconomic analysis of the municipal CHP station (PEC) in Stargard Szczecinski | Mazurek, Roksana |
16.12.2010 | Modeling of IGFC System: CO2 removal from gas streams, using membrane reactors | Huberg, Raido |
17.3.2011 | Multi-parametric indicators of energy products in biomass district heating system | Osterman, Eneja |
21.12.2010 | A new geothermal cooling – heating system for buildings : geothermal cooling – heating for hot – humid climates | Lech, Pawel Jan |